Process Technology of Cement Production (Module 1)

Nicht buchbar

Raw material preparation and cement grinding are the first and the last major process steps during cement production. The energy demand of these two processes amounts to up to 75% of the electrical energy used in a cement plant. This training will enable participants to obtain a better understanding of the comminution processes and the equipment used for material grinding to ensure high levels of availability, optimise production rates and reduce energy consumption.
Seminardetails
Seminarzeitraum 11.03.2019 - 15.03.2019
Seminarort VDZ Düsseldorf (Auf Karte anzeigen)
Teilnehmeranzahl (min./max.) 10 - 20
Status Nicht buchbar

Kontakt

Julia Volchkova

Tel.: +49-211-45 78-423

Fax: +49-211-45 78-400

Kontakt

Christiane Schmetz

Tel.: (0211) 45 78-252

Fax: (0211) 45 78-400

Termine Und Kosten

11.03.2019 - 22.03.2019
4.700,- € pro Teilnehmer
Nicht buchbar

Process Technology of Cement Production (Module 1) : 11.03.2019 - 15.03.2019
2.500,- € pro Teilnehmer
Nicht buchbar

Process Technology of Cement Production (Module 2) : 18.03.2019 - 22.03.2019
2.500,- € pro Teilnehmer
Nicht buchbar

Zusätzlich erhalten die Teilnehmer Zugriff auf ausgewählte Onlinekurse der VDZ-E-Learning-Plattform.

Ihre Anreise

Das vergünstigte DB-Veranstaltungsticket zum bundesweiten Festpreis

Wählen Sie für Ihre Anreise das vergünstigte DB-Veranstaltungsticket zum bundesweiten Festpreis.