Duration, Dates and Costs
In-class training
Modules 1 & 2
16 January – 27 January 2023
4,900 € per participant
The modules can be booked individually.
Module 1 (Grinding Technology and Raw Material Preparation)
16 January – 20 January 2023
Module 2 (Clinker Production and Material Technology)
23 January – 27 January 2023
Morning sessions from 08:30 till 12:00 (CET)
Afternoon sessions from 13:00 till 16:30 (CET)
Price for module 1: 2,750 € per participant
Price for module 2: 2,750 € per participant
4,900 € per participant for modules 1 & 2
Module 1
Grinding Technology and Raw Material Preparation
Raw material preparation and cement grinding are the first and the last major process steps during cement production. The energy demand of these two processes amounts to up to 75 % of the electrical energy used in a cement plant. This training will enable participants to obtain a better understanding of the comminution processes and the equipment used for material grinding to ensure high levels of availability,availability optimise production rates and reduce energy consumption.
Learning objectives
- Overview of all relevant aspects of the cement manufacturing process up to the application of cement in concrete.
- Attaining fundamental knowledge of raw material preparation and cement production with regard to comminution processes, equipment used and quality analysis.
Target groups
- Production personnel
- Process and control room operators
- Young engineers
Number of participants (min. - max.)
- 10 – 20
Topics
Raw materials extraction
- Mining operations
- Quality control in the quarry
- Raw material homogenisation
Quality parameters
- Understanding powder characteristics
- Particle size analysis
- Specific surface according to Blaine / BET - method
Grinding technology
- Ball mills
- Vertical roller mills (VRMs)
- High pressure roller mills
- Classifiers / tromp curve
- Open and closed circuit grinding
- Impact of grinding systems on cement properties
- Optimisation of grinding equipment
Module 2
Clinker Production and Material Technology
Clinker production is the most energy-intensive process step in cement manufacturing. It can represent up to 90 % of the total energy demand in a cement plant and is therefore a main focus not only with regard to cost optimisation and quality improvement of the final product, but also regarding emission control and the reduction of impacts on the environment. VDZ’s training will enable participants to obtain a deeper knowledge of the clinker production process and a better understanding of the impacts of the daily decisions of plant personnel on the plant’s performance (quality, electrical energy use, fuel consumption and emissions).
Learning objectives
- Attaining fundamental knowledge of cement manufacturing technology (material and burning technology), including the interconnection of sub-processes, process optimisation, emission abatement and efficient use of energy.
Target groups
- Young engineers
- Production personnel
- Technical staff
- Process engineers
- Quality and laboratory managers
Number of participants (min. - max.)
- 10 – 20
Topics
Material technology
- Characterisation of raw materials
- Clinker formation and clinker phases
- Clinker properties and effects on product qualities
Raw material preparation
- Blending beds and homogenisation silos
- Raw meal uniformity and quality control
Clinker production and burning technology
- Preheater, calciner, rotary kiln, burner, cooler
- Clinker burning reactions
- Alternative fuels and effects on burning process
- Circulation phenomena (chlorine, sulphur, alkalis, etc.)
- Energy efficiency
Environment and emissions abatement
(dust, NOx, SO2, organics, trace elements,...)
- Emission monitoring
- Emission abatement techniques
Refractories
Methods
- Presentations
- Interactive exercises
- Team work
- Group discussion
- Experience exchange
- Practical exercises
- Final exam (if requested)
Trainer
The training courses are led by experienced engineers and highly specialised researchers.
Certificate
The participants will receive a certificate of attendance.
Location
VDZ, Duesseldorf, Germany (nearest airport: DUS International)